About

Reports

COMPANY REPORTS

Annual Reports

2024-2025 • 2023-2024 • 2022-2023 • 2021-2022 • 2020-2021 • 2019-2020 • 2018-2019 • 2017-2018 • 2016-2017 • 2015-2016 • 2014-2015 • 2013-2014 • 2012-2013 • 2011-2012

Modern Slavery Statement

2025 • 2024 • 2023 • 2022

Sustainability Report

2024 • 2023

Voluntary Tax Transparency Report

2025 • 2024 • 2023 • 2022 •2021 • 2020 •2019 • 2018 • 2017

STEM Engagement & Education Report

2023

Snowy Hydro data at a glance
Our data sheet brings together key figures on our people, safety, community and performance to support the information in our annual report. View the data sheet here.


WATER

Water Releases

Snowy River releases
• Current Jindabyne Environmental Releases
• 2026/27 Snowy River Daily Release Targets

Snowy Montane releases
• Current Tantangara 30 day Releases
• 2026/27 Tantangara Dam Montane Release Targets

Upper Murrumbidgee contingency releases
• Upper Murrumbidgee Drought Operating Framework Weekly Report
Snowy Hydro has entered into agreements with the Commonwealth and NSW governments to release additional water from Tantangara Dam when specific drought triggers occur. The Upper Murrumbidgee Drought Operating Framework describes these triggers and is available here.

Western River releases
• Khancoban Releases
Actual releases from Khancoban Dam into the Swampy Plains River can also be accessed by downloading our SnowyLIVE water app from the App Store or Google Play.

Annual Water Operating Plan
2026-27
2025-26
2024-25
2023-24
2022-23
2021-22 

Snowy Hydro is required to produce a public version of the Annual Water Operating Plan (AWOP) each year. Each public AWOP contains a record of our compliance with the previous year’s release obligations and sets out the targets for the upcoming water year. These reports are intended to increase transparency by providing the public with more information about the water operations of the Snowy Scheme.

Water Compliance Reports
2019-20 • 2018-19 • 2017-18 • 2016-17 • 2015-16 • 2014-15 • 2013-14 • 2012-13 • 2011-12 

From 2020, compliance reporting is contained in the Annual Water Operating Plan for the following year, linked above.


CLOUD SEEDING

Reports and Papers

2024 • 2023 • 2022 • 2021 • 2020 • 2019 • 2018 • 2017 • 2016 • 2015 • 2014 • 2013

• SPERP Annual Report 2009 Executive Summary
• Scientific Research Papers


ENVIRONMENT

Environment Report

2014-15 • 2013-14

THE SNOWY SCHEME
Environmental Protection Licence

• EPL 10515 Scheme Wide Operations
• EPL 13161 Transport of Trackable Waste
• EPL 21051 Helicopter related activities

Monitoring Data

EPA ID number, location and data:
1. Murray 1 Power Station North Drainage Pit
2. Murray 1 Power Station South Drainage Pit
4. Murray 2 Power Station Drainage Pit
7. Tumut 1 Power Station Drainage Pit
9. Tumut 2 Power Station Drainage Pit
10. Tumut 3 Power Station Drainage Pit
11. Guthega Power Station oil/water separator discharge line
13. Blowering Power Station Drainage Pit
14. Jindabyne Pumping Station oil/water separator outlet
16. Eucumbene Dam River Outlet Works oil/water separator discharge
26. Jounama Power Station Drainage Pit

Pollution Incident Response Management Plan

For Scheme operations, a Pollution Incident Response Management Plan (PIRMP) has been developed and made publicly available in accordance with clauses 153A, 153C and 153D of Part 5.7A of the Protection of the Environment Operations (General) Regulation 2022. This PIRMP is applicable to Environmental Protection Licences (EPLs) 10515, 10379 & 13161.

• Scheme Public Pollution Incident Response Management Plan

Annual Dam Safety Standards Reports:

• 2025 Annual Dam Safety Standards Reports
• 2024 Annual Dam Safety Standards Reports
• 2023 Annual Dam Safety Standards Reports
• 2022 Annual Dam Safety Standards Report – Deep Creek
• 2022 Annual Dam Safety Standards Reports Cover Letter
• 2022 Annual Dam Safety Standards Reports Attestation

• Dam Safety Standards Reports Jan – Dec 2022 Statement
• 2022 Annual Dam Safety Standards Reports
• 2021 Dam Safety Annual Report Attestation
• 2021 Eucumbene Dam Annual Report
• 2021 Eucumbene Saddle Dam Annual Report
• 2021 Geehi Dam Annual Report
• 2021 Guthega Dam Annual Report
• 2021 Island Bend Dam Annual Report
• 2021 Jindabyne Dam Annual report
• 2021 Jounama Dam Annual Report
• 2021 Khancoban Dam Annual Report
• 2021 Murray 2 Dam Annual Report
• 2021 Talbingo Dam Annual Report
• 2021 Tantangara Dam Annual Report
• 2021 Tooma Dam Annual Report
• 2021 Tumut Pond Dam Annual Report
• 2021 Tumut 2 Dam Annual Report
• 2021 Tumut 3 Inlet Structure Annual Report


CABRAMURRA
Environmental Protection Licence

• EPL 10379 Cabramurra Town Sewage Treatment Plant

Monitoring Data

EPA ID number, location and data:
2, 3 and 4. Discharge from STP Outlet Tap, Upstream of STP discharge point, Downstream of STP discharge point




LONSDALE AND PORT STANVAC

ANGASTON
Environmental Licence

• Licence 41162 Angaston Power Station


LAVERTON NORTH

EPA Operating License

• Laverton EPA Operating Licence


VALLEY POWER
EPA Operating License 

• Valley Power EPA Operating Licence

Management Plans

• Bushfire Mitigation Plan
• Vegetation Management Plan