Contractor Portal

Contractor Portal: Policies and Commitment

Access Rules

Forms

Additional permit sign on

Additional change in recipient

F-AP13 isolation and restoration record sheet

Additional Practices:

AP23

AP41

SP24-62

F-AP02-A

F-AP26-A

Access Rules and Practices

The Access Rules and Practices apply specifically to work on or near Operational Apparatus or in Operational Areas

The Access Rules are to be considered alongside the Snowy Hydro Life Saving Rules and Quality Procedures. The Access Rules do not replace any other Snowy Hydro policy or procedure except where explicitly stated

Current Safety Topics

Arc Flash – For more information on the new arc flash requirements click here

2020 Access Rules training presentations – For practice review only

Access – Training presentation

Recipient/Operator – Training presentation

2020 Assessment Guides

Recipient verbal assessment – Assessment guide

Operator verbal assessment – Assessment Guide

Operator practical assessment – Assessment Guide




CONTRACTOR FORM







EMERGENCY PREPAREDNESS
Documents

SP24-40 Fire Systems Impairment and Notification Procedure
F24-40-A Fire System Impairment notification template – Ask your Snowy contact








Connect with us